Resource Type

Journal Article 26

Year

2022 1

2021 1

2019 1

2017 2

2013 2

2012 2

2011 2

2010 5

2009 6

2006 1

2005 1

2002 1

open ︾

Keywords

grouting 4

bearing capacity 2

curtain grouting 2

grouting technology 2

ship lift 2

slurry shield 2

Additive manufacturing 1

DX pile 1

Karst water burst 1

Laser polishing 1

Qiaoqi Hydropower Station 1

Qiyueshan Tunnel 1

Stitching errors 1

Synchronized control system 1

Three Gorges Project 1

Ximen Xiang’an Subsea Tunnel 1

Yesanguan Tunnel 1

a fault and crush zone of subsea tunnel 1

advanced geological forecast 1

blocking water and strengthen by grouting 1

open ︾

Search scope:

排序: Display mode:

Research on large slurry shield excavation parameter control under complex conditions

Wang Baiquan,Ren Yong,Jin Zhongxiang,Gu Yanqi

Strategic Study of CAE 2010, Volume 12, Issue 12,   Pages 65-69

Abstract: Some measures for shield posture control and a brief introduction on synchronized grouting parameters

Keywords: slurry shield     excavation parameter     synchronized grouting     slurry cycling     shield posture    

Experimental study on pile-end post-grouting piles for super-large bridge pile foundations

Weiming GONG, Guoliang DAI, Haowen ZHANG

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 2,   Pages 228-233 doi: 10.1007/s11709-009-0019-0

Abstract: The application of pile-end post-grouting piles for super-large bridge pile foundations in some importantdiameter varies from 2.5 m to 3 m, and the maximum length is 125 m; the bearing capacity of the post-groutingThe results show that the bearing capacity of the piles are increased in different degrees after grouting, duration of grouting lasting time, are different.In addition, the calculation formula for the post-grouting piles under specified grouting condition was

Keywords: self-balanced testing technique     pile-end post-grouting     bearing capacity     grouting technology    

Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite

Frontiers of Structural and Civil Engineering   Pages 827-854 doi: 10.1007/s11709-023-0954-1

Abstract: In this study, a fiber element model of a fabricated concrete pier with grouting sleeve-prestressed tendonsleeve-fabricated pier, and a grouting sleeve-prestressed tendon composite fabricated pier.Under traditional non-near-fault ground motions, the pier top displacements of the grouting sleeve-fabricatedIn addition, the plastic hinge zones of the grouting sleeve-fabricated pier and the composite fabricatedpier shifted to the joint seam and upper edge of the grouting sleeve, respectively.

Keywords: seismic performance     continuous girder bridge     grouting sleeve-prestressed tendon composite connections    

Analysis of load transfer stability control strategy in hydraulic synchronized continuous slippage

LIU Yan-bo, WU Jian-zhong, ZHANG Xuan

Frontiers of Mechanical Engineering 2006, Volume 1, Issue 2,   Pages 222-226 doi: 10.1007/s11465-006-0007-1

Abstract: Hydraulic synchronized continuous slippage technique, which integrates mechanical, electrical and hydraulic

Keywords: excessive     slippage technique     optimization     continuous slippage     engineering    

ideas and engineering practice of high-pressure water-rich fault “outside block and inside strenghthen grouting

Zhang Minqing,Zhang Mei

Strategic Study of CAE 2009, Volume 11, Issue 12,   Pages 26-34

Abstract: To overcome F11 fault early, the construction technology of "grouting to make solid, using waterwas changed into "outside block and inside strengthen grouting" .for weak water area and strengthened grouting for strong water area, following the principle of "The grouting holes and grouting quantity of "outside block and inside solid grouting"  are 50 % less than those of whole cross section grouting, and the grouting speed is 80 % higher when

Keywords: high-pressure water-rich fault     unevenness     blocking water and strengthen by grouting     outside blockand inside solid grouting     innovation    

Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel

Guo Xiaohong,Wang Mengshu

Strategic Study of CAE 2011, Volume 13, Issue 9,   Pages 38-41

Abstract: water inflow and great difficulty in construction in Xiamen Xiang'an Subsea Tunnel,full-sectional groutingreinforcement and waterproofing,5 m grouting inside heading, 70 m along longitudinal direction of tunneland superfine cement single-fluid grouting as major grouting material were applied according to poorMeanwhile,the corresponding parameters of grouting were established after drillings for grouting wereThe research results can provide technical reference for similar projects in grouting and waterproofing

Keywords: Ximen Xiang’an Subsea Tunnel     grouting reinforcement     stability     numerical simulation    

Clearance grouting process test of Three Gorges Project ship lift rack and nut column

Zhan Jianxia and Li Jihu

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 45-49

Abstract:

In order to choose the suitable grouting material and grouting process, and simulate the actual situation of clearance grouting of rack and nut column in ship lift, groutingComparing three kinds of domestic grouting material and the German PAGEL grouting material in groutingIn prototype grouting test, selection of the grouting equipment type, mixing time, templates seal, methodof grouting parameters control of grouting flow were researched, and some applicable grouting material

Keywords: rack     nut column     grouting     ship lift     Three Gorges Project    

Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault

Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG

Frontiers of Structural and Civil Engineering 2019, Volume 13, Issue 6,   Pages 1393-1404 doi: 10.1007/s11709-019-0563-1

Abstract: Pre-grouting is a popular ground treatment strategy utilized to enhance the strength and stability ofFirst, how should the grouting size be determined?Second, when should excavation begin after grouting?tunnel section are evaluated, thereby assisting designers by quantitatively assessing the effects of pre-grouting

Keywords: pre-grouting     stability analysis     factor of safety     discontinuity layout optimization    

A Laser Scanner–Stage Synchronized System Supporting the Large-Area Precision Polishing of Additive-Manufactured Article

Mengjia Cui, Libin Lu, Zhen Zhang, Yingchun Guan

Engineering 2021, Volume 7, Issue 12,   Pages 1732-1740 doi: 10.1016/j.eng.2020.06.028

Abstract:

This paper proposes a scanner–stage synchronized approach emphasizing a novel control structureThe proposed synchronized control system is composed of a motion decomposition module and an error synthesisThe proposed synchronized system paves the way for high-speed, high-precision, and large-area laser material

Keywords: Laser polishing     Stitching errors     Synchronized control system     Additive manufacturing    

Comparison between four piezoelectric energy harvesting circuits

Jinhao Qiu, Hao Jiang, Hongli Ji, Kongjun ZHU

Frontiers of Mechanical Engineering 2009, Volume 4, Issue 2,   Pages 153-159 doi: 10.1007/s11465-009-0031-z

Abstract: In this study, a simple source-less trigger circuit used to control the synchronized switch is proposed

Keywords: energy harvesting     piezoelectric materials     synchronized switching    

Synchronous grouting of large diameter slurry shield in water-rich sandy gravel stratum

Zhang Changqiang,Zhai Zhiguo,Chen Mingjuan,Jin Zhongxiang

Strategic Study of CAE 2010, Volume 12, Issue 12,   Pages 75-78

Abstract: posture and stratum deformation mechanism information, the empirical formula of the main parameters of synchronizedgrouting technologies is determined while the slurry shield is tunneling in sandy gravel stratum.

Keywords: sandy gravel stratum     slurry shield     synchronous grouting     construction technology    

Analysis for the Stability of Covered Karst Base and a Pre-disposing Way with Pressure Grouting

Sun Chengfang,Yang Anrong,Dong Hanxiong,Peng Shaomin

Strategic Study of CAE 2002, Volume 4, Issue 7,   Pages 56-59

Abstract: karst base, a kind of way, which can be adopted to predispose the covered karst base using pressure groutingThe evaluation of grouting effect indicates this way can be carried out economically and technically.

Keywords: karst base     pressure grouting     evaluation of effect    

Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project

Wang Shougen

Strategic Study of CAE 2005, Volume 7, Issue 3,   Pages 78-83

Abstract: The treatment scheme for the highly weathering rock mass on both abutments and grouting tests and groutingThe feasibility to adopt consolidation grouting and seepage treatment measures is argued and the treatment

Keywords: Qiaoqi Hydropower Station     earth-rock dam     treatment of abutment     highly weathered rock mass     consolidation grouting     curtain grouting    

The design of gear rack climbing type ship lift of Three Gorges Project

Niu Xingqiang,Tan Liming,Yu Qingkui

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 96-103

Abstract:

The Three Gorges ship lift is the largest and the most difficult one in the world with the characteristics of large lifting weight, high lift range, big fluctuation of water stage between upper and lower reaches and quick variation of navigable water level. After scheme comparison, the gear rack climbing type ship lift is selected, which is characterized by complicated structure of facilities and high precision requirements of manufacture, installation and construction. Meanwhile the Sino German co design method is first adopted. The general layout of gear rack climbing type ship lift, as well as the design schemes and key techniques of tower structure and important equipment are briefly introduced.

Keywords: ship lift     climbing type     safety mechanism     synchronized stroke    

Treatment techniques for Karst disaster of Maluqing Tunnel on Yichang-Wanzhou Railway

Yang Bing,Xiao Gangzhi

Strategic Study of CAE 2009, Volume 11, Issue 12,   Pages 69-76

Abstract: Finally, curtain grouting technology for stratum consolidation and pile-cap technology for spanning karst

Keywords: tunnel     Karst water burst     advanced geological forecast     curtain grouting    

Title Author Date Type Operation

Research on large slurry shield excavation parameter control under complex conditions

Wang Baiquan,Ren Yong,Jin Zhongxiang,Gu Yanqi

Journal Article

Experimental study on pile-end post-grouting piles for super-large bridge pile foundations

Weiming GONG, Guoliang DAI, Haowen ZHANG

Journal Article

Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite

Journal Article

Analysis of load transfer stability control strategy in hydraulic synchronized continuous slippage

LIU Yan-bo, WU Jian-zhong, ZHANG Xuan

Journal Article

ideas and engineering practice of high-pressure water-rich fault “outside block and inside strenghthen grouting

Zhang Minqing,Zhang Mei

Journal Article

Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel

Guo Xiaohong,Wang Mengshu

Journal Article

Clearance grouting process test of Three Gorges Project ship lift rack and nut column

Zhan Jianxia and Li Jihu

Journal Article

Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault

Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG

Journal Article

A Laser Scanner–Stage Synchronized System Supporting the Large-Area Precision Polishing of Additive-Manufactured

Mengjia Cui, Libin Lu, Zhen Zhang, Yingchun Guan

Journal Article

Comparison between four piezoelectric energy harvesting circuits

Jinhao Qiu, Hao Jiang, Hongli Ji, Kongjun ZHU

Journal Article

Synchronous grouting of large diameter slurry shield in water-rich sandy gravel stratum

Zhang Changqiang,Zhai Zhiguo,Chen Mingjuan,Jin Zhongxiang

Journal Article

Analysis for the Stability of Covered Karst Base and a Pre-disposing Way with Pressure Grouting

Sun Chengfang,Yang Anrong,Dong Hanxiong,Peng Shaomin

Journal Article

Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project

Wang Shougen

Journal Article

The design of gear rack climbing type ship lift of Three Gorges Project

Niu Xingqiang,Tan Liming,Yu Qingkui

Journal Article

Treatment techniques for Karst disaster of Maluqing Tunnel on Yichang-Wanzhou Railway

Yang Bing,Xiao Gangzhi

Journal Article